Past Performance1

Mumtaz has been implementing projects in different field of water supply, irrigation, civil construction and supply of construction material.

The following table summarizes the most significant projects with their status:

 

Project Name

Project Owner Type of Work Performed Value of Contract $

Project  Status

MUD 475 MoUD
  1. Supply and Installation of 180 km HDPE pipe.
  2. Supply and Installation of 3800 House Connections.
  3. Earth Work including excavation, backfilling, road instatement, construction of manholes.
26,000,000.00 Ongoing
MEW 1147 MEW
  1. Construction of Intakes Works of Join Naw Canal.
  2. Construction of 20 bridges over the canal.
  3. Construction of 13 Water dividers.
  4. Construction of 2000 m Embankment and over 28000 m3 gabion works.
  5. Over 8000 m3 RCC works
8,150,000.00 Ongoing
MUD 474 MoUD
  1. Supply and Installation of 22 Km DI pipe size from 100 mm up to 700 mm
  2. Earth Works including excavation (in soil and rock), backfilling , re-instatement of Roads and other infra-structures.
  3. Rehabilitation of two huge reservoirs
12,996,500.00 On-going
MUD 412 MoUD
  1. Supply and installation of 13 nos Water Reservoirs in four cities (Pul-i-Khumri, Sheberghan, Maimana and Taloqan)
  2. Supply and Installation of 16 nos pumps.
  3. Construction of 9 Guard Rooms, two booster pump stations, boundary walls
6,200,000.00 95% completed
Andkhoy-Amu Darya Pump Scheme Ministry of Energy and Water 1. Construction of 1nos x 12000 m3 concrete reservoir
2. Construction of 2 nos x 500 m3 concrete reservoir
3. Construction of 4 nos x 50 m3 elevated reservoir
4. Construction of 4 nos Generator House and 2 nos Booster Pump Stations
5. Construction of 3 nos wells
6. Construction of 5 nos Guard Rooms
7. Supply and Installation of 130 km pipeline mainly 315 mm dia
$11,750,000.00 100% Completed
Construction of Wells in Pul-U-Khumri, Taloqan, Sheberghan and Maimana Ministry of Urban Development
WB
1. Construction of 16 nos wells
2. Civil Work included construction of 16 nos x surrounding walls, filling/gravelling, access road
3. Construction of 16 nos Well Chambers
4. Construction of 3 nos Generator Rooms
5. Supply of uPVC pipes and well heads for 16 wells.
$1,200,000.00 100% Completed
Construction of Atishan Channel Ministry of Energy and Water Construction of 38 nos x irrigation structures which included:
1. Excavation:       17209 m3
2. Backfilling:        9469  m3
3. Mass Concrete: 5887 m3
4. PCC:                      1479 m3
5. RCC:                       493  m3
6. Gabion Work:    6774 m3
$1,760,000.00 95% Completed
Construction of Kambaragh Channel Ministry of Energy and Water Construction of 48 nos x irrigation structures which included:
1. Excavation:       10967 m3
2. Backfilling:        5200 m3
3. Mass Concrete: 3507 m3
4. PCC:                       646 m3
5. RCC:                      271 m3
6. Gabion Work:   4126 m3
1,200,000.00 90% Completed
Kabul Water Supply Project MUDH 472 Ministry of Urban Development
KFW / WB
The project Activities included:
1. Construction of 21 deep wells and 3 observation wells.
2. Civil Works included construction of 21 nos x surrounding walls, filling/gravelling, access road
3. Construction of 21 nos Well Heads.
4. Supply of uPVC pipes, well heads, etc for 21 wells.
1,610,000.00 Completed
Hirat Water Supply Project Phase II KFW / Kocks The Project  Activities included:

1. Installation of 1500 lm of DCI OD 600 pipe (Transmission Mains) including transportation/handling, installation, testing, construction of washouts and AVs, Construction of Manholes installation of fittings and vavles and River Crossing.

2. Installation of 400 meter of DCI OD 400 pipe including Transportation / handling, installation, testing, construction of washouts and AVs, installation of fittings and vavles.

3. Construction of 3000 m3 concrete reservoir including all accessories, pipes, fittings, gate valves, overflow, manholes, Water tight Testing and Connections.

4. Rehabilitation of previous 2000 m3 reservoir including dismantling of all connections/pipes/fittings, installation of new fittings/overflows/valves and inlet/outlet DCI pipes, cleaning and repairing of reservoir and testing.

5. Construction of 3 Generator Rooms including installation of Generator and fuel tanks.

6. Rehabilitation of existing Booster pump station including dismantling of previous pumps, pipes and fittings, installation of DCI 400 pipe lines from ground reservoirs to the booster pump and from booster pump to elevated water tank and distribution lines, installation of 4 pumps in booster pump stations including all fittings, valves, manometers etc. , mechanical test of the booster pump station, construction of manholes, thrust blocks and installation of chlronation plant.

7. Supply, transport, laying, testing and chloronation of 21 km pipe lines (OD 400, 315, 250, 180, 110 and 90 mm) including all earth works (excavation, bedding, backfilling, compaction, thrust blocks).
8. Supply, installation and testing of fittings required for 90 nodes including installation of surface boxes and spandles, earth work and connections to the previous system (GI, Asbest, PVC pipes).
9. Re-instatement of 3000 m2 pavement (asphalt and concrete).
10. Removal of 550 meter of existing Asbest pipe DN 250.

                 1,820,000.00 Completed
Hirat Water Supply Project Phase I KFW / Kocks / VINCI The Project  Activities included:
1. Construction of 10 nos wells including well development and testing, supplying of riser mains, well heads and a sumbersible pumps.
2. Construction of fencing and all accessory works for 10 nos wells.
3. Construction of 10 well chambers, 10 manholes for accommodation of Manometer and Avs.
4. Transport and installation of 5000 meter of DCI OD 600 mm pipes including testing and earth works (excavation, backfilling and compaction, re-instatment of pavements)
5. Supply and installation of fittings for collector pipes and transmission Mains.
                 1,050,000.00 Completed
Hirat Wate Supply Enlargement Project PRT Italy 1. Supply, transport and laying of 10.5 km of pipe lines ranges OD 250 mm, 160 mm, 110 mm, 90 mm and 63 mm including all earth works (excavation, backfilling, compaction, re-instatement of concrete/asphalt pavements). 298,000.00 Completed
2. Supply and installation of all valves, fittings, Gibults, etc. required for commissioning of 22 nodes of the projet including construction work of 22 nodes (excavation, concrete job, RCC slab, manhole cover DCI 60 cm, backfilling, etc.).
3. Supply, Installation and commissioning of 3 nos 250 KVA generators including all electrical jobs.
4. Connection of the old and new system.
5. Testing of pipelines after laying, chloronation and wahing out.
Kunduz Water Supply Project KFW / KOCKS 1.                  Construction of 6 nos wells including supply of riser pipes, installation of pumps, pipes, fittings, water meter, valves, well development and tests etc. $390,600.00 Completed
2.                  Construction of 6 nos well chambers including earth work.
3.                  Laying of 15 km of pipelines OD 200, 160, 110, 90 and 63 mm, testing and chlronoation of pipes, earth work (excavation, backfilling, river crossing, compaction)
4.                  Construction of 21 nodes including installation of fittings valves, testing, etc. aslo earth work (excavation, backfilling, compaction), installation of surface boxes and spandles.
5.                  House connections including laying of pipes, fittings, earth work.
Construction of Gala Toot School Adraskan District, Hirat Provicne ANA / REC Construction of a School including Sanitary Facility, surrounding wall, Water Supply and Electrical system $118,000.00 Completed
Construction of Security Barriers ANA / REC Construction of 140 nos of Jerssy, Texas and Alaskan type Concrete Barriers $90,400.00 Completed
Construction of Badam Bagh Irrigation System ASAP 1. Supply, transport and laying of 2390 m of pipe lines  OD 250 mm including all earth works (excavation, backfilling, compaction, re-instatement of concrete/asphalt pavements).
2. Construction of Intake.
3. Repair of existing reservoir.
4. Construction of Wash-out and AV facilities.
$395,000.00  Completed
Construction of Road and Darzak Pass in Qadis district of Badghis SFL 1. Construction of 14.5 km of primary road.
2. Construction of 14 culverts.
3. Construction of Darzak Pass (explosions, excavation, stone/soil removal and retention wall).
$350,000.00 Completed
Construction of Power House in Salma Dam Hirat Province Angelique International Excavation of 100000 m3 rock by using of explosives, removal of stone/soil $370,000.00 Completed
Construction of Hirat Industrial Park’s Wash GoA 1. Excavation of 150000 m3 soil,
2. Construction of 1000 m retention wall,
3. Construction of a bridge (20 m length) and
4. Construction of Aquaduct (20 m length).
$275,000.00 Completed
Construction of PE Factory Hanger and Administrative Building Private 1. Construction of 2000 m2 Hanger, complete.
2. Construction of 200 m2 Administrative Buildings.
3. Construction of 1000 m surrounding wall
1,150,000.00  Completed
Construction of Israr Business Center in Kabul Private 1. Construction of 5 story building in Kabul City $3,850,000.00  Completed
Construction of HSP Factory and Administrative Building Private 1. Construction of 2200 m2 Hanger
2. Rehabilitation of 350 m2 Administrative Blocks.
3. Rehabilitation of Electrical System.
4. Construction of Water Supply System.
5. Construction of security fence around the walls.
$350,000.00 Completed
Construction of Farzad Business Center Private Construction of 6 story building in Hirat City 335,000.00 Completed
Construction of Gazirgah Sharif Water Supply and Pump Station System ICRC / Italian Corporation 1. Construction of 10 km pipelines.
2. Construction of Booster Pump Station.
3. Construction of 50 m3 Concrete reservoir.
$85,000.00 Completed
Construction of Taqi Naqi Water Supply system PRT Italy 1. Construction of a deep well, Supply and Installation of Generator House and sumbersible Pump complete job.
2. Construction of 50 m3 elevated water tank.
3. Construction of 12000 m pipeline.
$210,000.00 Completed
Construction of Ghorian Water Supply Project Italian Corporation 1. Supply, layout and pressure test of 14500 m pipeline including earthwork, river crossings.
2. Construction of 13 manholes.
3. Supply and installation of fittings.
$145,000.00 Completed
Construction of Obeh Water Supply System Italian Corporation 1. Supply, layout and pressure test of 24500 m pipeline including earthwork, river crossings.
2. Construction of 22 manholes.
3. Supply and installation of fittings.
4. Construction of 60 wells with hand pumps.
$155,000.00 Completed